CBI – office fit out, Dubai
Corporate officeOffice fit outDubai

CBI – office fit out, Dubai

A clean, efficient corporate office for CBI: a backlit brand reception, glass-partitioned offices and long rows of bench workstations under bright, even lighting.

Client
CBI
Sector
Corporate office
Location
Dubai, UAE
Scope
Office fit out + MEP
Aftercare
12-month defects period

Project overview

An efficient office for a growing team

CBI needed an office that makes the most of its floor plate – plenty of desks, private offices for managers and a reception that presents the brand well.

IAN TECH delivered the fit out with the MEP coordination behind it – reception, glass partitions, ceilings, lighting, flooring and workstation zones – as one turnkey package.

Neutral walls, dark carpet, white bench desks and frameless glass keep the office bright, orderly and easy to adapt as the team grows.

Scope of work

What we delivered

Our team built the office and coordinated air conditioning, lighting, power and data for a high-density layout.

01

Reception

A dark reception counter with timber end panel and the CBI logo backlit on the wall behind.

02

Glass offices

A row of frameless glass offices along the corridor, keeping daylight flowing into the floor.

03

Bench workstations

Long white bench desks with central power and screens for an efficient, flexible layout.

04

Team zones

Workstations with fabric screens in clusters, separated by clear walkways.

05

Ceilings & lighting

Grid ceilings with recessed lighting for bright, even light across the whole floor.

06

MEP services

Air conditioning, lighting, power and data coordinated with the open-plan and office layout.

Gallery

Inside the finished space

Click any photo to view it full size.

CBI – Open-plan workstations
Open-plan workstations
CBI – Reception with backlit logo
Reception with backlit logo
CBI – Glass offices along the corridor
Glass offices along the corridor
CBI – Bench workstations
Bench workstations

How we delivered it

From site survey to handover

  1. Survey & design coordination

    Site survey, layout and finishes agreed with the client before any work started.

  2. Approvals

    Drawings prepared for the landlord and authority approvals needed before work on site.

  3. Fit out & MEP

    Partitions, ceilings, joinery, finishes and MEP installed by our own team on one programme.

  4. Snagging & handover

    Systems tested, snags closed and the space handed over with a 12-month defects period.

Planning an office fit out in Dubai?

Free site visit, then a fixed itemised quote. Our in-house team handles design, approvals, fit out and MEP – with a 12-month defects period.

More projects

Explore similar work

View all projects →