MEP Contracting

MEP Design and Engineering in Dubai

Good MEP design saves money twice: once on the build, and again on running costs. IAN TECH's MEP engineers design HVAC, electrical, plumbing and fire systems for fit out and renovation projects in Dubai, and produce drawings that are ready for Civil Defence and DEWA approval. Because the same company installs them, our designs are built to be buildable.

Since 2008 · 500+ clients · 50+ in-house specialists · Burj Khalifa Level 129

MEP design and engineering drawings for a Dubai project
Timeline
4–8 weekstypical office fit out
Approvals
DCD · DEWAsubmission-ready drawings
Deliverables
Load calcsand shop drawings
Coverage
All of DubaiDIFC to Dubai Hills

At a glance

MEP design and engineering in Dubai – key facts

Service
MEP design and engineering
Provider
IAN TECH LLC – fit out and MEP contractor in Dubai since 2008
Coverage
All Dubai communities: DIFC, Business Bay, Downtown, JLT, Dubai Marina, Palm Jumeirah and more
Approvals handled
Dubai Municipality, Dubai Civil Defence, DEWA, landlord and developer NOCs
Typical timeline
4–8 weeks for a typical office fit out, including approval comments

MEP design

MEP design and engineering services

01

Heat load and cooling calculations

02

HVAC layouts, duct and diffuser design

03

Electrical load schedules, single-line diagrams, lighting design

04

Plumbing and drainage design

05

Fire alarm and fire fighting layouts to Civil Defence code

06

Shop drawings, coordination drawings and as-built drawings

07

Design review and value engineering of third-party MEP designs

MEP layout and building plans

MEP design

Authority approvals

We prepare and submit MEP drawings to Dubai Civil Defence, DEWA and Dubai Municipality, respond to comments and follow through to approval.

HVAC ductwork designed and installed by IAN TECH

MEP design

Design and build vs a separate MEP consultant

A separate MEP consultant designs; a contractor builds; gaps between them become variations. With IAN TECH, design and installation are one responsibility. If you already have a consultant, we can work under them as the MEP contractor instead.

Areas we serve

MEP design and engineering across Dubai

Our teams work in every major business district and residential community in Dubai.

Downtown DubaiBusiness BayDIFCJumeirah Lake Towers (JLT)Dubai MarinaPalm JumeirahDubai Media CityDubai Internet CityDubai Studio CityAl BarshaDeiraBur DubaiDubai HillsArabian RanchesAl Quoz

FAQs

MEP consultants FAQs

What does an MEP consultant do?

An MEP consultant designs the building's mechanical, electrical and plumbing systems, prepares drawings and calculations, and gets them approved.

Do I need an MEP consultant for an office fit out?

If the layout changes ducts, sprinklers or power, yes: the changes need designed drawings and Civil Defence approval.

How long does MEP design take?

For a typical office fit out, 4–8 weeks including approval comments.

Free consultation

Send your layout for an MEP design proposal

Share a few details and a project manager will call you to arrange a free site visit anywhere in Dubai.

  1. We call you backWithin one working day, to understand the scope.
  2. Free site visitA survey of the space and your requirements.
  3. Fixed, itemised quoteWith a clear programme and the approvals needed.

Call+971 52 795 1407

WhatsAppChat with us

Email[email protected]

FacebookIanTechLLC

Office101 Muzaffar Building, Deira, Dubai

Request a free quote

Takes under a minute. UAE mobile numbers only.

    We reply within one working day. Your details are used only to respond to this enquiry.