Renovation

Villa Renovation in Dubai

Renovating a villa is personal, and it is also a construction project with approvals, MEP and a family still living nearby. IAN TECH LLC is one of the villa renovation companies in Dubai that handles all of it: design, structural and MEP works, joinery, finishes and the permits from your master developer and Dubai Municipality. Our villa work includes Palm Villa B97, and our team has delivered projects across Dubai since 2008.

Since 2008 · 500+ clients · 50+ in-house specialists · Burj Khalifa Level 129

Villa renovation in Dubai – Palm Villa B97 pool and terrace by IAN TECH
Partial
6–10 weekskitchens and bathrooms
Full
3–6 monthsplus approvals
Approvals
Developer · DMhandled for you
Aftercare
12 monthsdefects period

At a glance

Villa renovation in Dubai – key facts

Service
Villa renovation
Provider
IAN TECH LLC – fit out and MEP contractor in Dubai since 2008
Coverage
All Dubai communities: DIFC, Business Bay, Downtown, JLT, Dubai Marina, Palm Jumeirah and more
Approvals handled
Dubai Municipality, Dubai Civil Defence, DEWA, landlord and developer NOCs
Typical timeline
Partial renovation about 6–10 weeks; full renovation 3–6 months, plus approvals

Villa renovation

Villa renovation services

01

Full villa renovation and remodelling

02

Kitchen and bathroom renovation

03

Villa extensions, room additions and annexes

04

Layout changes and open-plan conversions

05

Flooring, ceilings, painting and lighting

06

MEP upgrades: AC replacement, rewiring, plumbing

07

Bespoke joinery: wardrobes, kitchens, walk-in closets

08

Outdoor works: pergolas, majlis, pool areas

Villa outdoor pergola renovation in Dubai

Villa renovation

Do I need approval to renovate my villa in Dubai?

Most structural changes, extensions and MEP upgrades need permission. We prepare the drawings and manage approvals from Dubai Municipality and your master developer (Emaar, Nakheel, Dubai Properties, Meraas and others), so work starts legally and passes inspection.

How we work

Our villa renovation process

  1. Free site visit and wish list

  2. Design, 3D views and itemised quote

  3. Approvals and NOCs

  4. Renovation works with a dedicated site supervisor

  5. Snagging walk-through and handover

  6. Warranty and aftercare (12-month defects period)

Cost guide

How much does villa renovation cost in Dubai?

What drives the cost: structural changes, MEP, finish level and approvals.

ScopeTypical duration
Refresh (paint, flooring, lighting)3–6 weeks
Partial renovation (kitchen + bathrooms)6–10 weeks
Full renovation3–6 months
Extension4–8 months

Selected projects

Villa renovation projects

Ask us for before-and-after photos of similar villas at your free site visit.

Why IAN TECH

Why IAN TECH among villa renovation companies in Dubai

  • Commercial-grade project management on residential jobs
  • Own MEP team: AC and electrics done right, not patched
  • In-house joinery for kitchens and wardrobes
  • Approvals handled, so you are not chasing developers
  • One fixed quote, one programme, one point of contact
Talk to our team
IAN TECH LLC project in Dubai

Areas we serve

Villa renovation across Dubai

Our teams work in every major business district and residential community in Dubai.

Downtown DubaiBusiness BayDIFCJumeirah Lake Towers (JLT)Dubai MarinaPalm JumeirahDubai Media CityDubai Internet CityDubai Studio CityAl BarshaDeiraBur DubaiDubai HillsArabian RanchesAl Quoz

FAQs

Villa renovation FAQs

How much does villa renovation cost in Dubai?

It depends on size, scope and finishes. We provide an itemised quote after a free visit.

How long does a villa renovation take?

A partial renovation takes about 6–10 weeks, a full renovation 3–6 months, plus approvals.

Can we live in the villa during renovation?

For partial works, usually yes; we phase rooms and keep the site safe. For full renovations we recommend moving out.

Do I need approval to renovate my villa?

Cosmetic work usually doesn't; structural changes, extensions and MEP changes need Dubai Municipality and developer approval. We handle both.

Do you do villa extensions?

Yes, including design, structural drawings and approvals.

Free consultation

Book a free villa site visit

Share a few details and a project manager will call you to arrange a free site visit anywhere in Dubai.

  1. We call you backWithin one working day, to understand the scope.
  2. Free site visitA survey of the space and your requirements.
  3. Fixed, itemised quoteWith a clear programme and the approvals needed.

Call+971 52 795 1407

WhatsAppChat with us

Email[email protected]

FacebookIanTechLLC

Office101 Muzaffar Building, Deira, Dubai

Request a free quote

Takes under a minute. UAE mobile numbers only.

    We reply within one working day. Your details are used only to respond to this enquiry.