FRV – office fit out in JLT, Dubai
Corporate officeOffice fit outJLT

FRV – office fit out in JLT, Dubai

A warm, welcoming JLT office for FRV: a branded reception under a glowing cove ceiling, timber-look floors and a bright meeting room overlooking the lakes.

Client
FRV
Sector
Corporate office
Location
Jumeirah Lake Towers, Dubai
Scope
Office fit out + MEP
Aftercare
12-month defects period

Project overview

A compact office with a strong first impression

In a smaller office, the reception and meeting room do a lot of the work. FRV wanted a JLT space that feels warm and professional for visitors and practical for the team.

IAN TECH delivered the fit out with the MEP coordination behind it – reception, ceilings, lighting, partitions, flooring and finishes – as one turnkey package.

A cove-lit bulkhead, warm timber-look flooring and the bright orange FRV logo give the space a friendly, confident character.

Scope of work

What we delivered

Our team built the interior and coordinated air conditioning, lighting and power with the new ceilings and layout.

01

Reception

A white reception counter in front of the circular orange FRV logo, under a warm cove-lit bulkhead.

02

Ceilings & lighting

Suspended ceilings with a concealed LED cove, recessed downlights and a small pendant cluster.

03

Meeting room

A long white meeting table for the team and visitors, with lake views and clean ceiling lighting.

04

Offices

Glass-fronted offices off the reception that keep daylight flowing through the space.

05

Flooring

Warm timber-look flooring through the reception and circulation areas.

06

MEP services

Air conditioning, lighting and power coordinated with the ceilings and new layout.

Gallery

Inside the finished space

Click any photo to view it full size.

FRV – JLT – Branded reception under a cove-lit ceiling
Branded reception under a cove-lit ceiling
FRV – JLT – Meeting room
Meeting room
FRV – JLT – Reception counter and offices
Reception counter and offices

How we delivered it

From site survey to handover

  1. Survey & design coordination

    Site survey, layout and finishes agreed with the client before any work started.

  2. Approvals

    Drawings prepared for the landlord and authority approvals needed before work on site.

  3. Fit out & MEP

    Partitions, ceilings, joinery, finishes and MEP installed by our own team on one programme.

  4. Snagging & handover

    Systems tested, snags closed and the space handed over with a 12-month defects period.

Planning an office fit out in JLT?

Free site visit, then a fixed itemised quote. Our in-house team handles design, approvals, fit out and MEP – with a 12-month defects period.

More projects

Explore similar work

View all projects →