
Nivea (Beiersdorf) – office fit out, Dubai
A large, bright open-plan office for Beiersdorf, the company behind Nivea – brand walls in Nivea blue, planter-topped storage, a media wall and suspended ceiling features over the team areas.
- Client
- Beiersdorf (Nivea)
- Sector
- Consumer goods
- Location
- Dubai, UAE
- Scope
- Office fit out + MEP
- Aftercare
- 12-month defects period
Project overview
A big open-plan office that still feels personal
Large open-plan floors can feel anonymous. Beiersdorf wanted its Dubai office to carry the Nivea brand clearly and give a big team a bright, organised place to work.
IAN TECH delivered the office fit out with the MEP coordination behind it – workstations layout, ceilings, lighting, joinery, brand walls and finishes – as one programme.
Blue carpet and brand graphics echo Nivea’s colours, while planters, suspended ceiling features and white joinery keep the floor light and fresh.
Scope of work
What we delivered
Our team built the workspace and coordinated air conditioning, lighting, power and data for a large open-plan floor.
Brand walls
Feature walls carrying the Beiersdorf and Nivea logos in brand blue at key points on the floor.
Open-plan workspace
Rows of workstations on blue carpet with screens, laid out for a large team and clear walkways.
Planter storage
Curved white storage units topped with planting, dividing teams without closing the space.
Media wall
A white joinery wall with twin screens for presentations, updates and brand content.
Ceilings & lighting
Suspended ceiling features over work zones, with even lighting across the floor.
MEP services
Air conditioning, lighting, power and data coordinated with the open-plan layout.
Gallery
Inside the finished space
Click any photo to view it full size.





Design & materials
Nivea blue, white and green
Brand colour, white joinery and planting keep a large floor bright and recognisable.
How we delivered it
From site survey to handover
Survey & design coordination
Site survey, layout and finishes agreed with the client before any work started.
Approvals
Drawings prepared for the landlord and authority approvals needed before work on site.
Fit out & MEP
Partitions, ceilings, joinery, finishes and MEP installed by our own team on one programme.
Snagging & handover
Systems tested, snags closed and the space handed over with a 12-month defects period.
Services on this project
The services behind this project
Planning an office fit out in Dubai?
Free site visit, then a fixed itemised quote. Our in-house team handles design, approvals, fit out and MEP – with a 12-month defects period.
More projects











